[Week 9 FYP2] Development of Easy Parking Finder System



Activity Title :

- Design and make project prototype. 
- Cutting and assemble prototype part. 

Objective :

To get the better design and prototype for this project. 

Content :

After hardware and app is done, i start making the prototype. Actually, my project is focusing to multi level parking that follow the futuristic building. This project also focus on only android phone. 



i choose wood as my medium because it can easily buy in the market and the cost to use this material is not very expensive. 



  

 I have planed i want to make a box that the box keep all the electronic part in it. So, when it done, i can easily changes or make any modification. 

 




Result and Analysis:

As a result, i make 4 box that will content 4 Nodemcu and represent 4 parking slot. 



Conclusion:
As a conclusion, the 4 box represent 4 parking lot is successfully done.. 

Comments

Popular posts from this blog

[Week 13 FYP2] Development of Easy Parking Finder System

[Week 7 FYP1] Development of Easy Parking Finder System

[Week 14 FYP1] Development of Easy Parking Finder System